Scheme objectives

In this section

Scheme objectives

Scheme objectives have been developed based upon the need for the scheme and the issues identified at the M5 Junction 9 and along the A46. The objectives are to:

  • Improve local journey times and reliability during peak periods at M5 Junction 9 and on the existing A46 corridor between M5 Junction 9 and Teddington Hands roundabout
  • Improve the overall performance of the A46 strategic corridor between the M5 to the south and the A46 to the north of Evesham, ensuring the route provides a reliable connection between the Midlands and South-West England
  • Improve safety performance at M5 Junction 9 and the A46 between M5 Junction 9 and Aston Cross for all users 
  • Reduce severance and improve the experience for walking and cycling journeys at M5 Junction 9 and along/across the A438 and A46 between Tewkesbury School and Aston Cross
  • Ensure the Strategic Road Network meets likely future development needs in the Ashchurch area considering potential for long-term growth

Further information regarding the need for the scheme and development of objectives is available in the following documents: