County Resurfacing Works
Investment and improvement of Gloucestershire’s Highways network is a top priority. We work in all seasons to resurface the maximum number of roads we can each year.
- See the schedule below to find out when Highways will be working in your area.
- Where possible, pedestrian access will be maintained where a designated footway is available.
- Due to the weather and other factors, dates and times may change at short notice.
- At the bottom of this page you will find official correspondence and accompanying diversion route for each resurfacing scheme.
For updates, please check local road signs and social media: follow GlosRoads on X, follow Gloucestershire Roads on Facebook
Check this website page, social media and local signs for the latest update.
Many aspects need to be taken into consideration when planning works, however our resurfacing programme is dependent on several factors. It can be affected by things like; heavy rain, changes in temperatures and other weather events, as well as plant breakdown and unforeseen technical issues that arise once work has begun.
Many aspects need to be taken into consideration when planning works, however our resurfacing programme is dependent on several factors. It can be affected by things like; heavy rain, changes in temperatures and other weather events, as well as plant breakdown and unforeseen technical issues that arise once work has begun.
As the work involves hot asphalt and large equipment, we will be unable to allow traffic through the Road Closure. If you normally drive into or out of the Road Closure during the hours when the closure is in place, we ask you to please make alternative arrangements.
In exceptional circumstances, some level of access may be considered on a case by case basis but only where it does not impact our ability to undertake the necessary works and where it is safe to do so.
Please see the FAQ leaflet for further details.
As the work involves hot asphalt and large equipment, we will be unable to allow traffic through the Road Closure. If you normally drive into or out of the Road Closure during the hours when the closure is in place, we ask you to please make alternative arrangements.
In exceptional circumstances, some level of access may be considered on a case by case basis but only where it does not impact our ability to undertake the necessary works and where it is safe to do so.
Please see the FAQ leaflet for further details.
If you usually park on the road within the road closure, you will need to find alternative parking nearby during the hours of the road closure. There is a possibility that your vehicle may be towed out of the area if it is obstructing the works.
If you usually park on the road within the road closure, you will need to find alternative parking nearby during the hours of the road closure. There is a possibility that your vehicle may be towed out of the area if it is obstructing the works.
We always consider night working as an option however there are specific environmental conditions under which we are permitted to work at night, meaning often this is not feasible. We will only work at night on key routes and where the volume of traffic per day means that any potential disruption to local residents has to be balanced against the needs of the wider public.
We always consider night working as an option however there are specific environmental conditions under which we are permitted to work at night, meaning often this is not feasible. We will only work at night on key routes and where the volume of traffic per day means that any potential disruption to local residents has to be balanced against the needs of the wider public.
We appreciate that any road closure could have an impact on business operations, however to deliver the works as quickly and efficiently as possible, we kindly ask you to work with us. To help us to complete the works with the least disruption to you, we ask you to:
- Reschedule your deliveries to outside of our working hours
- Where possible, please consider if staff can park outside of the closure and walk in during our operational hours or share a lift to work to limit the number of vehicles needing access. Access to vehicles will only be considered on a case by case basis but only where it does not impact our ability to undertake the necessary works and where it is safe to do so.
- Keep your customers up to date with details of the road closure and give them details of how and when they will be able to get to you.
We appreciate that any road closure could have an impact on business operations, however to deliver the works as quickly and efficiently as possible, we kindly ask you to work with us. To help us to complete the works with the least disruption to you, we ask you to:
- Reschedule your deliveries to outside of our working hours
- Where possible, please consider if staff can park outside of the closure and walk in during our operational hours or share a lift to work to limit the number of vehicles needing access. Access to vehicles will only be considered on a case by case basis but only where it does not impact our ability to undertake the necessary works and where it is safe to do so.
- Keep your customers up to date with details of the road closure and give them details of how and when they will be able to get to you.
In most circumstances we will distribute letters before we start work to notify those within the road closure of the up coming works. The best place to get the most up-to-date information is via road signs, this web page and our social media channels. At the bottom of this page you will find letters with detail about each resurfacing scheme and the official diversion route.
In most circumstances we will distribute letters before we start work to notify those within the road closure of the up coming works. The best place to get the most up-to-date information is via road signs, this web page and our social media channels. At the bottom of this page you will find letters with detail about each resurfacing scheme and the official diversion route.
Please check the FAQ's by clicking here. Alternatively call our helpline on 08000 514514 if you cannot find what you’re looking for. Or email highwaysstakeholder@gloucestershire.gov.uk
Please check the FAQ's by clicking here. Alternatively call our helpline on 08000 514514 if you cannot find what you’re looking for. Or email highwaysstakeholder@gloucestershire.gov.uk
Structural Maintenance Resurfacing Programme
May 2026 - June 2026
Resurfacing works are delivered Monday to Friday, scheme dates below do not include weekends unless otherwise stated.
(Updated on 18th May 2026)
|
District |
Scheme |
Operational |
Planned Start Date |
Planned End |
| Tewkesbury |
B4213 Haw Bridge |
Nights (19:00 to 07:00) |
12/05/2026 |
18/05/2026 |
| Cotswolds |
3/125 Church View to Middle Road |
Restricted Days (09:30 to 15:30) |
14/05/2026 |
19/05/2026 |
| Tewkesbury |
4/335 Tirley Street to Pitch Farm |
Restricted Days (09:30 to 15:30) |
18/05/2026 |
20/05/2026 |
| Cheltenham |
4/90751 Farmfield Road |
Restricted Days (09:00 to 15:00) |
18/05/2026 |
26/05/2026 |
| Cotswolds |
3/126 Batsford Road |
Unrestricted Days (07:00 to 19:00) |
19/05/2026 |
28/05/2026 |
| Tewkesbury |
3/76 Deerhurst Road |
Unrestricted Days (07:00 to 19:00) |
21/05/2026 |
22/05/2026 |
| Forest |
3/69 Newent Road |
Unrestricted Days (07:00 to 19:00) |
22/05/2026 |
27/05/2026 |
| Cotswolds |
B4632 Broadway Road and Main Street |
Restricted Days (09:30 to 15:30) |
26/05/2026 |
05/06/2026 |
| Forest |
4/325 Bradfords Lane |
Restricted Days (09:30 to 15:30) |
27/05/2026 |
Saturday |
| Tewkesbury |
3/365 Court Road Brockworth |
Restricted Days (09:30 to 15:30) |
27/05/2026 |
29/05/2026 |
| Cheltenham |
4/90516 Malvern Road |
Nights (20:00 to 07:00) |
01/06/2026 |
04/06/2026 |
| Forest |
4/481 Glebe Road & Vauxhall |
Restricted Days (09:00 to 15:00) |
01/06/2026 |
10/06/2026 |
| Cotswold |
3/130 Moreton Road |
Restricted Days (09:00 to 15:00) |
02/06/2026 |
10/06/2026 |
| Tewkesbury |
A46 & 3/380 Crosshands Roundabout |
Nights (20:00 to 07:00) |
03/06/2026 |
11/06/2026 |
Details of resurfacing works in your area

3/69 Newent Road Staunton
4/325 Bradfords Lane Newent
4/481 Glebe Road & Vauxhall Newent
3/69 Newent Road Staunton
4/325 Bradfords Lane Newent
4/481 Glebe Road & Vauxhall Newent
3/125 Church View to Middle Road Aston Magna
3/126 Batsford Road Moreton-in-Marsh
B4632 Broadway Road and Main Street Willersey
3/130 Moreton Road Longborough (section 2)
3/125 Church View to Middle Road Aston Magna
3/126 Batsford Road Moreton-in-Marsh
B4632 Broadway Road and Main Street Willersey
3/130 Moreton Road Longborough (section 2)
4/90751 Farmfield Road Cheltenham
4/90516 Malvern Road Cheltenham
4/90751 Farmfield Road Cheltenham
4/90516 Malvern Road Cheltenham
No Works Currently Planned for Gloucester Area
No Works Currently Planned for Gloucester Area
No Works Currently Planned for Stroud
No Works Currently Planned for Stroud
B4213 Haw Bridge Tirley
4/335 Tirley Street to Pitch Farm Tirley
3/76 Deerhurst Road Deerhurst
3/365 Court Road Brockworth
A46 & 3/380 Crosshands Roundabout Brockworth
B4213 Haw Bridge Tirley
4/335 Tirley Street to Pitch Farm Tirley
3/76 Deerhurst Road Deerhurst
3/365 Court Road Brockworth
A46 & 3/380 Crosshands Roundabout Brockworth