The works

What work is planned?

Before main construction can begin, a number of enabling activities are required, including:

  • Diversion of utility services.
  • Temporary scaffold structures.
  • Temporary pedestrian management arrangements.
  • Land access agreements.
  • Final technical approvals and tendering.

Why the Work Is Needed

Recent inspections have identified significant deterioration to key structural elements of the bridge, including:

  • Deck bearings
  • Abutment capping beam
  • Deck waterproofing system

In addition, there is evidence of water pressure building up behind the abutments, which can compromise the structure over time.

These issues mean that repairs are needed to maintain safety and bring the bridge in line with current engineering standards and environmental requirements.

What We’re Doing

To address these concerns, GCC will carry out a full deck replacement of the bridge. This approach allows:

  • Replacement of all defective elements
  • Improved structural performance
  • Increased load-carrying capacity to meet modern standards

 

 